Permits on file
40
City of Fort Worth permits. The feed has no contractor field and no dedicated issue date. We use the status date, falling back to the file date when the status date is in the future.
Loading recent permit counts…
Permits on file
40
Last 30 days
40
Prior 30 days
0
The last 30 days are ahead of the 30 days before that (40 vs 0).
Solar · score 80 · 2026-10-22
SOLAR ROOFTOP, BACKUP BATTERY
Solar · score 80 · 2026-10-22
Install 2 PV battery backup systems to existing PV system
Solar · score 80 · 2026-10-22
SOLAR ROOFTOP, BACKUP BATTERY
Solar · score 80 · 2026-10-21
Installation of a 10.12 kW DC solar system with 23 solar panels, 1 inverter, and 4 batteries.